Mobile
Log In Sign Up
Home > english-chinese > "hanging clock" in Chinese

Chinese translation for "hanging clock"

挂钟

Related Translations:
hung keung:  洪强
hung my:  兴美
top hung:  上悬式
sammo hung:  洪金宝元龙
hang time:  跳起后滞留空中的时间,滞空时间。
hung thinh:  兴盛
pa hang:  巴杭
hanging loop:  吊袢/耳仔领吊袢,挂耳先向下的斤斗
hanging hip:  髋关节悬吊术
hanging garment:  挂装
Example Sentences:
1.For example , if hanging clocks for an exhibit is a critical task , you can reduce its scope by hanging fewer clocks than originally planned
譬如,如果悬挂展览会的钟表是一项关键任务,则减少悬挂钟表的数目,即可缩小其范围。
2.For example , painting museum walls and hanging clocks are tasks that , when combined with other tasks , result in the completion of a clockwork exhibit
譬如,粉刷展览馆墙壁和悬挂钟表都是任务,和其他任务组合起来,产生的结果就是完成钟表艺术展览会。
3.* * * the work can overlap . if the museum crew prepares one gallery wall at a time , maybe they can start hanging clocks before all the walls are finished
譬如,博物馆全体工作人员准备依次布置陈列室的墙壁,则他们可以在所有墙壁粉刷结束之前就开始悬挂钟表。
4.For example , the exhibit planner might add lag time between painting a wall and hanging clocks on the wall , because the planner knows the paint will take time to dry
譬如,展览会的计划者可能在粉刷墙壁和在墙上悬挂钟表之间添加延隔时间,即涂料干燥所需的时间。
5.For example , if you specify a fixed start date for hanging clocks on a wall and the date for painting the walls slips , you and the clocks are going to get awfully messy
譬如,如果为悬挂钟表指定了固定的开始日期,但是粉刷墙壁的日期有所推迟,那么您的项目和这些钟表就会出现混乱。
6.For example , if the museum crew already knows where each clock is going to hang on the walls , they can begin attaching descriptive labels below each clock ' s space while they are hanging clocks
譬如,如果展览会工作人员知道各个钟表悬挂的位置,那么他们在挂钟表的同时就可以在每个钟表的位置下贴上说明标签。
7.For example , in preparation for a clockwork exhibit , the tasks " painting the walls , " " hanging clocks , " and " arranging furniture " are scheduled for monday , tuesday , and wednesday , respectively
譬如,在钟表装置展览的准备工作中, “粉刷墙壁” 、 “悬挂钟表”和“布置家具”三项任务分别安排在周一、周二和周三。
8.Once these tasks are linked , microsoft project will always schedule the start date for hanging clocks relative to the finish date for painting walls , no matter when these tasks occur
这些任务相互链接后,无论它们何时发生, microsoftproject总会根据“粉刷墙壁”任务的完成日期来排定“悬挂钟表”任务的开始日期,从而避免将任务限制在某个可能无法实现的固定日期。
9.Later on , as you enter additional information about tasks , such as their dependencies on other tasks ( for example , hang clocks on the wall only after the paint has dried ) , microsoft project automatically sets more realistic start dates
输入任务的附加信息以及对其他任务的依赖性(譬如,在粉刷干燥后,才悬挂钟表)后, microsoftproject将自动设置实际的开始日期。
10.However , by switching furniture arranging ( which does n ' t depend on the walls being dry ) to tuesday and hanging clocks to wednesday , the project stays on schedule , without wasting days or possibly increasing the project duration . .
然而,通过将家具布置(它不依赖于墙是否干燥)调换到周二,悬挂钟表调换到周三,就可以保证遵循项目的日程,而不会浪费时间和增加工期。
Similar Words:
"hanging cirque" Chinese translation, "hanging clamp" Chinese translation, "hanging clinome ter" Chinese translation, "hanging clinometer" Chinese translation, "hanging clip" Chinese translation, "hanging colter" Chinese translation, "hanging committee" Chinese translation, "hanging compass" Chinese translation, "hanging container" Chinese translation, "hanging core" Chinese translation